Monthly Archives: July 2015

Simulcast

So we’re finally testing simulcast.  After learning a lot about simulcast our plan to test changed a bit.  I had planned on implementing this on Cedarwood and Pueblo but given the tremendous overlap in coverage we chose a different transmitter site.  The Simulcast transmitters are on Cedarwood and Methodist as those sites have minimal overlap.  We still don’t have any GPSDO’s installed to control transmitter frequency but I hope to at least have one installed on Methodist before the snow flies and continue learning about this technology.